Substation Construction

Double Vision specializes in building Electrical Substations up to 380 kV. Double Vision Team mates are highly trained to work safely around energized facilities whether in new construction environments or when making modifications to existing substations.  Substation installations and modifications through 380,000 Volts

Double Vision Substation is mainly divided into following areas,

  1. Small Power design supply and installation.
  2.  Substation Electrical Equipment Installation and Engineering.
  • 380/230/132/115/110 KV GIS Installation.
  • Power Transformer Installation & Erection.
  • LCC, C&P, Battery Bank, AC/DC DB SAS Panel Installation.
  • Cable tray & Cable ladder installation
  • Cable pulling (low voltage, control Cable & MV Cable)
  • Cable termination (MV Cable, low voltage & control Cable)
  • Grounding, Earthing & Lightning Protection Works
  •  Installation of Switch gear 13.8 & 33 kV
  • Installation of Lightning mast
  • Installation of gas & oil Filtration receptacle.
  • Installation of lighting pole
  • Installation of indoor & outdoor lighting system.
  • 13.8 KV Caps Bank Installation.
  • Concrete cable trench installations either precast or cast in place
  • Control and Relay Panel Wiring
  • Coordination Studies, Relay settings, Testing and Start up
  • Transformers and Breaker  furnished and installed
  • Unit Substations, Isolated Phase Bus power Duct through 35,000 Volts
  • Switchgear Installations through 35,000Volts
  • Repairing Equipment in Energized substations
  • Overhead welded substation bus