Substation Construction (up to 380 kV)

Double Vision Ltd.

Substation Construction (up to 380 kV)

.03

Overview

Double Vision Co specializes in the construction of electrical substations up to 132 kV and provides installation services for systems up to 380 kV. Our team consists of highly trained professionals capable of working safely around energized facilities, whether in new construction environments or while executing modifications to existing substations. We are committed to delivering projects that meet the highest standards of safety, quality, and performance.

Our scope of work covers the complete range of engineering, installation, and commissioning activities required for modern substations. This includes small power system design, supply, and installation, as well as electrical equipment erection such as GIS installations up to 380 kV, power transformers, LCCs, C&P panels, battery banks, AC/DC distribution boards, and SAS panels.

What’s Included

  • GIS/AIS installation (380/230/132/115/110 kV)
  • Power transformer erection and oil processing
  • MV switchgear (e.g., 13.8 kV, 33 kV), AC/DC, chargers, UPS, SAS/SCADA panels
  • Cable trays/ladders, LV/MV/control cable pulling & terminations
  • Earthing, lightning protection, lighting and auxiliary systems
  • Functional testing, pre-commissioning and energization support

Deliverables

  • Method statements, ITPs, red-lines, as-built drawings
  • Test packs and commissioning reports
  • O&M manuals and training

Standards & Interfaces

IEC/IEEE and local utility standards with close coordination across civil, protection, telecom, and utility teams.

Out of Scope

  • Primary civil design/major civil works
  • Owner-furnished major equipment procurement
  • Long-term operations (available separately)

Safety & Quality

PTW/LOTO, calibrated tools, OEM-approved procedures, and full quality records.